top of page

Wear plate replacement on Danieli-Henschel PTC1230-H packaging machine in Sweden



Our project begins with a thorough inspection to assess the condition of the Danieli-Henschel PTC1230-H packaging machine on site in Sweden. Through a comprehensive assessment, Thomas Stadie determines the exact repair requirements to ensure optimal performance.


Efficient coordination is paramount to the success of this project. Thomas Stadie coordinates every aspect to ensure a seamless workflow and timely completion. Highly skilled technicians, knowledgeable in the intricacies of metal recycling machinery, are assigned to perform the repair tasks with precision and expertise. Thomas Stadie emphasizes on sourcing high-quality spare parts to meet the specifications of the Danieli-Henschel PTC1230-H baling machine and ensure a long service life. Thomas Stadie will carefully monitor the entire repair process, adhering to strict quality standards.


Once the repair work has been completed, a thorough final inspection is carried out to check the functionality of the packaging machine. We ensure that all requirements are met before carrying out a revision acceptance.


The repair work will include replacing the complete wear plates to improve durability and efficiency as well as replacing the seals on all cylinders to prevent leaks and optimize performance.


Implementation is planned for April 2024. The project is expected to be completed within one month to minimize downtime and maximize productivity.


With our commitment to excellence and expertise in metal recycling machinery solutions, we guarantee outstanding results for the Danieli-Henschel PTC1230-H packaging machine. Rely on our expertise to achieve exceptional results tailored to your needs.


Further pictures of the project will follow after completion.

Scope of Services


PLANNING & COORDINATION:

  • Inspection, damage assessment and determination of repair requirements

  • Project coordination

  • Assignment of technicians

  • Procurement of spare parts

  • Construction supervision

  • Final inspection & revision acceptance


REPAIR

  • Replacement of the complete wear plates

  • Replacement of seals on all cylinders


Time frame

1 month - implementation planned for April 2024


bottom of page